New Builds & Future Homes Standard

Electrical design for new homes—and the Future Homes Standard.

NGE coordinates power, lighting, controls, data and energy systems from the plans stage, helping new homes work as one complete system rather than a collection of disconnected technologies.

Contemporary new-build home representing early electrical and Future Homes Standard planning
New-home electrical planning

Future Homes Standard 2026

What it means for a new-home project.

The Future Homes Standard is changing how new homes in England are designed, serviced and handed over. The electrical installation now sits at the centre of more connected decisions: renewable generation, low-carbon heating, room controls, EV charging, monitoring, data and commissioning.

That makes early coordination important. The aim is not to add technology for its own sake; it is to provide the right capacity, routes, controls and information for the home being designed.

The practical electrical brief

Six areas that need to work together.

The precise compliance solution varies by project. These are the electrical and controls interfaces NGE can help the wider design team coordinate before construction fixes the options.

01

Supply & distribution

Incoming capacity, distribution, plant locations, larger loads, containment and sensible provision for future change.

02

Renewable electricity

Solar PV interfaces, generation routes, metering and controls considered with roof design, electrical capacity and energy demand.

03

Heating & room control

Electrical supplies and controls for heat pumps, hot water, underfloor heating, ventilation and room-level comfort.

04

EV & load management

Charging capacity, cable routes and load control planned alongside the rest of the home rather than added as an afterthought.

05

Monitoring & smart control

Useful data and coordinated controls that help occupants understand and operate the systems installed in their home.

06

Commissioning & handover

Testing, commissioning and clear system information so the completed installation can be operated and maintained properly.

Where NGE fits

One electrical, energy and controls conversation.

NGE helps homeowners, self-builders, architects, builders and small developers turn the wider performance strategy into a coordinated electrical installation.

Review the plans early

Understand the rooms, plant, major loads, roof and external works while changes are still practical.

Expose the interfaces

Bring lighting, heating, ventilation, solar, EV, data, security and smart control into one joined-up brief.

Design the electrical foundation

Plan circuits, distribution, containment, controls, equipment locations and capacity around the agreed systems.

Install, test and commission

Deliver the agreed NGE scope carefully and provide clear information for handover and future support.

NGE is the electrical, energy and controls integrator—not the project’s building-control body or energy assessor. Final compliance routes and approvals remain with the appropriately appointed project professionals.

Current knowledge, practical delivery

Ready to coordinate the systems behind a better-performing home.

NGE brings practical experience in electrical installation, smart-home control, architectural lighting and residential energy systems. That experience helps us ask better questions early and work constructively with the rest of the project team.

  • Calm, technology-neutral advice
  • Integrated design rather than disconnected products
  • Only the systems and scope the project genuinely needs
  • Clear boundaries, commissioning and handover

From plans to handover

A coordinated route through the project.

01

Understand the project

Review the drawings, location, programme, intended systems and current design stage.

02

Coordinate the brief

Work with the homeowner and relevant architect, builder, energy assessor and specialists to identify requirements and interfaces.

03

Plan the infrastructure

Develop the electrical, lighting, controls, data and energy provisions within NGE’s agreed scope.

04

Install and commission

Complete, test and commission the agreed installation, coordinating changes as the build develops.

05

Handover and support

Provide clear information for the installed systems and remain available as the occupants begin using the home.

Genuine NGE evidence

Whole-home coordination proven in substantial renovations.

These are completed renovation projects rather than completed NGE new builds. They provide genuine evidence of the joined-up electrical, lighting, connected-home and energy thinking that new-home projects also need.

Completed riverside home showing NGE whole-home electrical coordination

Pangbourne Riverside Renovation

Full rewire, distribution, architectural and integrated lighting, network infrastructure, CCTV and EV charging across a substantial home.

View the Pangbourne project
Purley on Thames renovation with coordinated electrical and lighting design

Purley on Thames

Electrical foundations, layered lighting, underfloor-heating provision and customer-selected connected controls coordinated through a major renovation.

View the Purley project

Future Homes Standard questions

Clear answers before the design is fixed.

What is the Future Homes Standard?

It is the new energy-performance framework for new homes in England. For the electrical scope, the practical focus includes coordinated building services, controls, on-site renewable electricity generation, commissioning and clear handover information.

When does the new standard start?

The 2026 edition of Approved Document L takes effect on 24 March 2027 for building work in England that is not connected with higher-risk building work. Separate timing and transitional arrangements can apply, so the project team should confirm the route for each development.

Does every new home need solar panels?

The 2026 Part L requirements generally require on-site renewable electricity generation for newly erected dwellings, but defined exceptions and alternative arrangements exist. The energy assessor, designer and building control team should confirm the compliant solution for the project.

Does the Future Homes Standard require a battery?

Battery storage is not a universal requirement. Where storage is appropriate, NGE can help coordinate the electrical capacity, controls, installation interfaces, commissioning and future expansion.

When should NGE become involved?

Ideally during concept or technical design, before first fix. Early involvement allows supplies, distribution, lighting, heating controls, data, solar, EV charging and future routes to be coordinated while plans can still change.

Can NGE work with our architect, builder and energy assessor?

Yes. NGE can coordinate the agreed electrical, energy and controls scope with the wider project team. Compliance decisions and approvals remain with the appropriately appointed designers, assessor and building control body.

Planning a new home?

Bring NGE into the conversation early.

Your plans do not need to be final. A useful first conversation can begin with:

  • Plans or drawings currently available
  • Project location
  • Current concept, design or build stage
  • Systems already being considered

Technical wording checked against the UK Government’s Approved Document L, Volume 1: Dwellings, 2026 edition. Project-specific advice should come from the appropriately appointed design and compliance professionals.